Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling
Notify me about similar jobsAbout this opportunity
Job title: Site Engineering Specialist – Maintenance, Project Execution, Planning and Scheduling
Location: Singapore
About the Job: Site Engineering Specialist combines maintenance and reliability with project engineering. The role keeps process and utility equipment running reliably through CMMS-driven planning, SOPs, and deviation management, while delivering capital and modification projects from concept to handover (PMR, URS, Change Control, IQ/OQ/PQ).
About Sanofi:
We’re an R&D-driven, AI-powered biopharma company committed to improving people’s lives and delivering compelling growth. Our deep understanding of the immune system – and innovative pipeline – enables us to invent medicines and vaccines that treat and protect millions of people around the world. Together, we chase the miracles of science to improve people’s lives.
Key Responsibilities
Maintenance & Reliability
Oversee operation, maintenance, planning/scheduling, and performance monitoring of process equipment and utility/facility systems (rotating equipment, pumps, reactors, spray driers, electrical systems, air compressors, chillers, AHUs, cooling towers, water systems, static equipment and related infrastructure)
Act as CMMS expert (SAP or equivalent) for planning, scheduling, and tracking preventive and corrective maintenance
Coordinate with vendors/contractors for preventive maintenance, servicing, and repair
Write, review, and update SOPs for utility and equipment operations
Prepare Reliability KPIs and annual utility performance reports
Investigate, document, and report deviations/non-conformances; drive CAPA
Respond to and troubleshoot equipment/utility breakdowns and emergencies
Support sustainability initiatives (energy/water efficiency, emissions reduction, resource optimization)
Project Execution & Engineering Change
Coordinate and execute engineering/capital projects from concept through commissioning, handover, and close-out
Develop, track, and update project schedules, milestones, and action logs
Conduct site inspections to monitor construction, installation, and commissioning against approved plans
Prepare and manage Plant Modification Requests (PMR), User Requirement Specifications (URS), and Change Controls
Support qualification/validation activities (IQ, OQ, PQ)
Prepare project reports, punch lists, commissioning reports, and close-out documentation
Support audits, inspections, and regulatory reviews related to projects and equipment modifications
Vendor, Budget & Stakeholder Management
Participate in capital and maintenance budget planning
Assist in vendor selection, technical evaluations, and bid assessments; monitor vendor/contractor performance
Coordinate cross-functional stakeholders, contractors, and consultants
Track KPIs for schedule adherence, cost performance, safety, and quality
Compliance & Continuous Improvement
Ensure compliance with EHS, regulatory, and internal engineering standards
Support implementation of engineering and maintenance best practices
Participate in lessons-learned reviews and continuous improvement initiatives
Qualifications & Requirements
Essential
Bachelor’s degree in engineering (Electrical and, Instrumentation, Automation, discipline)
Experience in maintenance/reliability engineering and/or project engineering within an industrial or regulated environment
CMMS proficiency (SAP or equivalent) and understanding of maintenance planning/scheduling
Strong written communication skills, SOPs, deviation reports, project reports
Ability to manage multiple priorities/projects simultaneously
Proficient in Microsoft Office (Word, Excel, PowerPoint, Project); familiarity with BMS is a plus
Good analytical, troubleshooting, and problem-solving skills
Preferred
Experience in a regulated industry (pharmaceutical, biotech, chemical, or similar GMP/EHS environment)
Knowledge of GMP, Change Control, and Validation processes
Familiarity with AutoCAD and engineering drawing review
Experience managing contractors/vendors in a live operational environment
Key Competencies
Strong engineering fundamentals and technical problem-solving
Effective stakeholder communication across all organizational levels
High accountability, ownership, and attention to detail
Ability to work independently and collaboratively across cross-functional teams
Working Conditions
Combination of office-based work and regular site activities
Occasional work outside regular hours during shutdowns/critical project phases
PPE required during site visits, inspections, and construction oversight
Why Choose Us
Join Sanofi as a Site Engineering Specialist
🔬 Purpose-driven work: You'll keep the equipment and utilities running that directly support the manufacture of medicines and vaccines, your reliability work has a direct line to patient impact.
🏗️ Breadth of ownership: This role spans both maintenance/reliability and project engineering, giving you end-to-end exposure, from day-to-day asset performance to leading capital projects from concept through commissioning.
📈 Growth and variety: Work across diverse systems, rotating equipment, utilities, electrical systems, and facility infrastructure, while building skills in GMP, Change Control, and validation (IQ/OQ/PQ).
🤝 Cross-functional exposure: Regular collaboration with Quality, EHS, Operations, vendors, and project stakeholders builds strong organizational visibility and relationships.
💡 Culture of continuous improvement: Be part of lessons-learned reviews and best-practice initiatives that shape how the site operates.
❤️ Values-led organization: Work guided by Sanofi's values, Aim Higher, Act for Patients, Be Bold, and Lead Together, in a company chasing the miracles of science.
Pursue Progress . Discover Extraordinary .
Join Sanofi and step into a new era of science - where your growth can be just as transformative as the work we do. We invest in you to reach further, think faster, and do what’s never-been-done-before. You’ll help push boundaries, challenge convention, and build smarter solutions that reach the communities we serve. Ready to chase the miracles of science and improve people’s lives? Let’s Pursue Progress and Discover Extraordinary – together.
At Sanofi, we provide equal opportunities to all regardless of race, color, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, disability, gender identity, protected veteran status or other characteristics protected by law.
Pursue progress , discover extraordinary
Better is out there. Better medications, better outcomes, better science. But progress doesn’t happen without people – people from different backgrounds, in different locations, doing different roles, all united by one thing: a desire to make miracles happen. So, let’s be those people.
At Sanofi, we provide equal opportunities to all regardless of race, colour, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, ability or gender identity.
Watch our ALL IN video and check out our Diversity Equity and Inclusion actions at sanofi.com !
Job details
How this role compares
Computed from every other active Manufacturing & CMC role in our database, not just this employer's listings.
We currently track 3753 comparable Manufacturing & CMC roles across 173 biopharma companies.
Salary context
921 of 3753 peers report a salary range (USD, annualized)
Peers share this role's job function. This posting doesn't list a seniority level, so peers aren't narrowed by seniority either -- the range below may span more levels than usual.
Where these roles are based
Top locations among the 3753 comparable roles
+ 58 more countries
Seniority mix
1670 of 3753 peers have a known seniority level
Therapeutic area mix
24 of 3753 peers have a known therapeutic area; the rest are genuinely unlabeled, not hidden
Similar opportunities
The closest matches from our peer group, ranked by how similar they are, not how well you'd qualify for them -- treat this as market context, not a guaranteed shortlist; a weak match is labeled as one below.
Notify me about similar jobs
Get an email when we spot other openings like this one – same job function, comparable seniority, roles you'd actually want to see.
Or follow a whole field: get every new Manufacturing & CMC job in Singapore, and choose locations and companies.
How we calculate "similar"
No black box, no LLM guesswork: a deterministic score built from four normalized attributes. Here's this role's own peer group at different match levels, so you can see the mechanism, not just the result.
Every comparison starts from the same 100-point budget: 25 for working in the same function, 40 for the same therapeutic area, 20 for the same or adjacent seniority, 15 for the same country. A dimension we can't confirm on both sides contributes nothing, never a guess, never a free pass.
0 points, never a partial guess. A role we know almost nothing about beyond its function bottoms out at 25%; it never inflates to 100% just because there's little to compare against. Seniority uses a defined ladder (Associate → Manager → Associate Director → Senior → Principal → Director → Senior Director → Executive/VP) so "Director" and "Senior Director" count as adjacent, but "Director" and "Executive/VP" do not.